中文 | EN | RU

Public building

Case Type : Plant                                                                  D、Design drawing illustration: 
Geographic Position: Harbin(126.63 degrees east longitude                        
---45.75 degrees north latitude)

A、Design Parameter
Average outdoor temperature in winter: about -18.9℃
Indoor temperature:18-20℃
Maintenance Structure : steel structure
Window Form: plastic steel with double-deck cavity glass
Construction story height: below 8 meters
Energy Conservation Target: national construction energy conservation 50%
Heating system recommendation:
Altered far infared intelligent heating heater
Power Design:Factory
120-150W/㎡(covered area)
Heating Period:183 days( October 15th the same year to April 15th next year)
B、Operating Cost:
Altered far infared intelligent heating heater about RMB 30-45 yuan /year//㎡
C、Design Basis:
1、“Heating ventilation and air conditioning design specification” (JBJ19—87)2001
2、“Civil architecture energy conservation design standard (housing heating part)”
3、“Civil architecture thermal performance design specification”

 

Pay attention to altered:

Copyright:Harbin Altered Technology Co., Ltd. Black ICP Preparation No.10202465 -1