中文 | EN | RU

Household Application

Case Type : multi-story housing /high-rise housing                                                                                     

Geographic Position : Harbin(126.63 degrees east longitude
---45.75 degrees north latitude)
A、Design Parameter
Average outdoor temperature in winter: about -18.9℃
Indoor temperature:18-22℃
Maintenance Structure : ceramsite concrete block
Window Form: plastic steel with triplex cavity glass
Construction story height: below 3.5 meters
Energy Conservation Target: national construction energy conservation 65%
Heating system recommendation:
Altered intelligent electric floor heating system
Altered cable heating system
Power Design:
Altered intelligent electric floor heating design   
60-75 W/㎡(covered area)
Altered cable heating system             
75-85 W/㎡(covered area)
Heating Period :183 days( October 15th the same year to April 15th next year)
B、Operating Cost:
Altered intelligent electric floor heating system about RMB 15-20 yuan /year//㎡                                                                    
Altered cable heating system about RMB 22-26 yuan /year//㎡
C、Design Basis :
1、“Heating ventilation and air conditioning design specification” (JBJ19—87)2001
2、“Civil architecture energy conservation design standard (housing heating part)”
3、“Civil architecture thermal performance design specification”
4、“Surface radiation heating technology regulation
5、DB23/1203-2007 “Heilongjiang low-temperature electric floor heating film technology regulation

 

Pay attention to altered:

Copyright:Harbin Altered Technology Co., Ltd. Black ICP Preparation No.10202465 -1